Pangram verdict · v3.3
We believe that this text is a mix of AI and human-written content.
AI likelihood · overall
MixedArticle text · 1,451 words · 44 segments analyzed
Free · Sourced · Citable Where public EV charging falls short along U.S. highways and in which counties, which DC fast stations meet the federal NEVI minimums or take a NACS plug, how chargers hold up, and how the network grows, county by county in Colorado and state by state. Every figure comes from our database or a named, dated, linked source. The catalog today: 58,164 charging locations with 273,246 ports across all 50 states and DC. A charging location is one physical charging site: every charger at one address counts once. A port is one plug that can charge one car at a time. Last updated November 6, 2026, 7:30 AM UTC.
Rebuilt daily from our live database.
Catalog for harvesters: /data.json (DCAT-US 1.1).
Also on Zenodo (DOI 10.5281/zenodo.23984554) and Hugging Face (NEVI check and highway gaps, public charging stations and charging by state). Quick answer · November 6, 2026 What free EV charging data can I download here? As of November 6, 2026, this page publishes 20 free files on U.S.
public EV charging, rebuilt daily. 881 stretches of U.S.
highway have open public DC fast chargers more than 50 miles apart, 22 of them in Colorado. 2,547 of 15,927 open public DC fast stations in the 50 states and DC meet the federal NEVI station minimums. Our own files are CC BY 4.0, and station facts from the Alternative Fuels Data Center are U.S.
public domain. Which files can I download? 20 files, each as CSV and JSON. Section File Rows Version Last changed a U.S.
highway charging gaps over 50 miles 881 v6 November 5, 2026 b U.S. DC fast stations checked against NEVI minimums 15,927 v6 November 5, 2026 b Corridor miles meeting 50-mile NEVI spacing, by state 710 v6 November 5, 2026 c Working-Now Score roll-up by network, Colorado county and corridor 0 v1 October 31, 2026 d Public charging stations (NREL fields) 83,886 v6 November 6, 2026 e Outages and repairs 0 v1 October 31, 2026 e Hours, access and pricing corrections 1 v1 October 31, 2026 e Removed or relocated stations 0 v1 October 31, 2026 f Colorado public charging by county 64 v6 November 5, 2026 f Monthly new public charging by state 153 v7 November 5, 2026 f Monthly new public charging by Colorado county 192 v6 November 5, 2026 g State public charging per resident and per EV 51 v6 November 5, 2026 h I-70 fast chargers, Denver to Grand Junction 53 v3 November 5, 2026 h I-25 fast chargers in Colorado, Wyoming line to New Mexico line 99 v5 November 5, 2026 h I-76 fast chargers, Denver to the Nebraska line 14 v3 November 5, 2026 h US-285 fast chargers, Denver to the New Mexico line 15 v3 November 5, 2026 h CO-82 fast chargers, Glenwood Springs to Aspen 8 v1 October 31, 2026 h US-40 fast chargers, I-70 to Steamboat Springs 7 v1 October 31, 2026 i EV charging access by U.S.
county 3,144 v1 November 5, 2026 j Non-Tesla DC fast chargers with NACS (J3400) plugs 1,924 v1 November 5, 2026 a. Where are the gaps between fast chargers on U.S.
highways? The 50-mile line comes from FHWA’s NEVI guidance of February 10, 2022, which counted a state’s Interstates as fully built out with a charger every 50 miles.
FHWA’s guidance of August 11, 2025 leaves spacing to each state.
Colorado’s 2025 NEVI plan keeps 50 miles.
23 CFR part 680 sets station minimums, not spacing.
U.S.
highway charging gaps over 50 miles Every stretch of Interstate and U.S.
highway in the 50 states and DC, and of every other road FHWA designates as an EV Alternative Fuel Corridor, where open public DC fast chargers are more than 50 miles apart along the road.
State, mile markers, coordinates, gap length and corridor designation. Rows881Versionv6Last changedNovember 5, 2026AreaUnited States CC BY 4.0 · Rebuilt daily Cite as ChargingNear.me.
“U.S.
highway charging gaps over 50 miles.” US EV Charging Open Data, version 6, November 5, 2026. https://chargingnear.me/data#us-highway-charging-gaps.
CC BY 4.0.
Column dictionary 21 columns ColumnMeaning gap_idStable ID: state, highway, start mile marker, end mile marker.
stateTwo-letter code of the state the stretch is in.
A highway that crosses a state line is split there.
highwayHighway as signed: I-70, US-40. Other designated roads keep FHWA’s name: CO-82, Bluegrass Parkway. directionAlways “both”: a charger counts for both directions of travel. start_mile_markerMile marker where the gap starts (one decimal). See mile_marker_basis. end_mile_markerMile marker where the gap ends.
mile_marker_basisstate_route_measure: the route measure the state reports to FHWA in HPMS (often, not always, the posted milepost).
from_south_or_west_end: miles from the south or west end of this line in the state.
gap_milesMiles along the highway between the two ends (one decimal).
start_typeWhat starts the gap: charger, state_line, national_border (Canada or Mexico), or highway_end (the highway ends, or its line stops where it shares road with another highway).
start_descriptionThe charger’s name and city, the state line or border, or the junction.
start_afdc_station_idAFDC ID of the charger that starts the gap; empty for a state line, border or highway end.
start_latitudeLatitude of the point on the highway where the gap starts (WGS 84).
start_longitudeLongitude of that point.
end_typeAs start_type, for the end of the gap. end_descriptionAs start_description, for the end. end_afdc_station_idAFDC ID of the charger that ends the gap. end_latitudeLatitude of the point on the highway where the gap ends. end_longitudeLongitude of that point. designated_corridor_milesMiles of the gap on an FHWA-designated EV Alternative Fuel Corridor. corridor_statusFHWA status of those miles: ready, pending, both, partly, or not designated. fhwa_corridorFHWA corridor name(s) for the designated miles. Methodology Highway lines and mile markers come from FHWA’s Highway Performance Monitoring System (HPMS, 2024 data year): every mainline section a state signed as Interstate or U.S.
highway.
Several states leave that signing blank in HPMS (Texas, California, Maryland and Delaware among them), so a section’s signing also comes from FHWA’s National Highway System dataset, which records the posted route for the same HPMS route IDs.
Sections of one highway in one state are joined end to end; a second carriageway or couplet drawn beside the first is dropped. Roads FHWA designates that are not Interstate or U.S. highways (state routes, parkways, turnpikes) use FHWA’s own corridor lines.Mile markers come from the route measure each state reports to FHWA in HPMS, where it runs continuously along the line (state_route_measure).
It often matches the posted mileposts (it does for I-70 in Colorado) but not always: some states measure from a different starting point or by section.
Where the measure does not run continuously, such as one that restarts by county, the markers are miles from the south or west end of the line within the state (from_south_or_west_end).Chargers are AFDC stations listed as open and public with at least one DC fast port, any network and any plug, including Tesla.
A charger serves a highway when it is within 1 mile of it in a straight line.
Chargers just across a state line count.We walk each highway from end to end and record every stretch longer than 50 miles between consecutive chargers, or between a charger and a state line, the Canada or Mexico border, or the end of the highway.
Gap length is measured along the highway.Why 50 miles: FHWA’s February 10, 2022 NEVI guidance treated a state’s corridors as fully built out when chargers were installed every 50 miles along its Interstates. FHWA’s August 11, 2025 interim final guidance superseded it and leaves spacing to each state; Colorado’s NEVI plan (CDOT and the Colorado Energy Office, 2025 update) keeps a 50-mile target. 23 CFR part 680 itself sets no spacing. We use 50 miles everywhere so states can be compared.Corridor designation comes from FHWA’s Alternative Fuel Corridors map (Round 8), matched to the highway lines within 0.1 mile. A corridor named for another road counts only where that road has no line of its own there.Known limitsStraight-line distance to the highway, not driving distance to the exit.Where two highways share the road, the line is drawn once, under one of them, so the shared miles appear once.Chargers in Canada and Mexico are not in AFDC’s U.S. listing, so a gap ending at a border may be shorter in practice.A charger listed as open in AFDC may be down on a given day; the gaps assume it works.
Sources 10 U.S.
Department of Energy, Alternative Fuels Data Center Station Locator (National Laboratory of the Rockies, formerly NREL), read daily by our syncFHWA Highway Performance Monitoring System (HPMS), 2024 data year, public geospatial release (USDOT/BTS)FHWA National Highway System (USDOT/BTS National Transportation Atlas Database, updated August 8, 2025), August 8, 2025FHWA Alternative Fuel Corridors, Round 8 (USDOT/BTS National Transportation Atlas Database, Jan 16, 2025)U.S.